Beirut Terraces

A truly unique project from an architecture and structure point of view, winning multiple awards worldwide for the cutting edge systems used. One of which was the 45 cm voided post-tension slab, spanning 15 meters with 5 meters cantilevers all around the building.

The fast track project scheduled casting of one 2000 m2 post-tension slab every 9 days, Mega Prefab was in charge of the post-tension design as well as the installation using our own labor team.

Main Contractor: MAN entreprise

Consultant: Khatib & Alami

Location: Beirut

Project Size: 50000 m²

Date Completed: 2014-09-01