Naher el bared schools

This project was entirely done using the Mega Homes system,a total precast construction system
Mega Prefab designed, manufactured and constructed the two adjacent schools, this turnkey project was delivered successfully on time.
Using two cranes and two teams the buildings were erected at the same time.
Hollow core slab and prestressed beams, exposed aggregate facade,precast Internal walls and precast stair flights were installed in this building.

Client: UNRWA

Consultant: Rafik El-Khoury & Partners

Location: Naher el bared

Project Size: 12000 m²

Date Completed: 2011-04-29